Override a schedule?

Get help with all aspects of SABnzbd
Forum rules
Help us help you:
  • Are you using the latest stable version of SABnzbd? Downloads page.
  • Tell us what system you run SABnzbd on.
  • Adhere to the forum rules.
  • Do you experience problems during downloading?
    Check your connection in Status and Interface settings window.
    Use Test Server in Config > Servers.
    We will probably ask you to do a test using only basic settings.
  • Do you experience problems during repair or unpacking?
    Enable +Debug logging in the Status and Interface settings window and share the relevant parts of the log here using [ code ] sections.
Post Reply
teszeract
Release Testers
Release Testers
Posts: 13
Joined: August 30th, 2010, 1:54 am

Override a schedule?

Post by teszeract »

Hi

New user of SABNZBD here. I was wondering if I have a whole slew of large downloads that are scheduled to DL on my offpeak hours; if I can  download a single file immediately?

As an aside, I do find the play, play all, pause and pause all buttons confusing.
teszeract
Release Testers
Release Testers
Posts: 13
Joined: August 30th, 2010, 1:54 am

Re: Override a schedule?

Post by teszeract »

Great. Thanks for the reply.
Post Reply