Page 1 of 1

Override a schedule?

Posted: August 30th, 2010, 2:05 am
by teszeract
Hi

New user of SABNZBD here. I was wondering if I have a whole slew of large downloads that are scheduled to DL on my offpeak hours; if I canĀ  download a single file immediately?

As an aside, I do find the play, play all, pause and pause all buttons confusing.

Re: Override a schedule?

Posted: August 31st, 2010, 2:22 am
by teszeract
Great. Thanks for the reply.